Removal Procedure
- Block the wheels.
- Drain all of the air reservoirs. Refer to
Draining Reservoirs
.
- Remove the air lines. Refer to
Hose and Line Replacement - Nylon and Metal Compression
.
- Remove the following components:
- Remove the quick release valve from the
bracket.
- Inspect the air lines for the following conditions:
- Repair or replace any damaged, kinked, or worn air lines.
Installation Procedure
- Install the quick release valve to the
bracket.
- Install the following components:
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the quick release valve nuts to 22 N·m (16 lb ft).
- Install the air lines. Refer to
Hose and Line Replacement - Nylon and Metal Compression
.
- Perform the air leakage test. Refer to
Air Brake Quick Release Valve Operational Check
.
- Perform the operational test. Refer to
Air Brake Quick Release Valve Leakage Test
.
- Remove the wheels blocks.